#SailDonnybrook

Thursday, April 22, 2010

Spring Work

Spring work is here! Only three more weekend days of work left. Mike and Roxray are in for Sunday. I can use help the following weekend.
Planned for this Sunday, April 25:
  • Clean the interior and replace the cushions
  • Clean lifelines
  • Rebuild the boom outhaul
  • Clean lazarettes and tighten screws
  • Fix engine instruments
  • Charge batteries
  • De-winterize the fresh water system
For Saturday and Sunday, May 1 and 2:
  • Wash, polish, and wax (3-4 coats) the topsides
  • Wash and wax the hull (1 or 2 coats)
  • Bottom paint
  • Wash and wax the mast
  • Install the rub rail
The boat goes in the water Friday, May 7 and we bring her home to Belmont Harbor Saturday, May 8!

2 comments:

  1. Captain Kyle, count me in for 5/1 and 5/2. I would also be interested in crewing for the 2010 Mac Race! Thanks, David Dabdoub

    ReplyDelete
  2. Damn! I'm stuck here in FL or I'd be THERE! Have fun with 1st day on H2O.

    ReplyDelete